Before roof replacement, create safe access around the house, protect vulnerable belongings, move vehicles and outdoor items, secure pets, identify utilities and landscape concerns, and confirm the day-of-work communication plan. The roofing contractor should define the actual limits and sequence; this checklist helps the homeowner prepare useful questions.
Confirm the work-zone plan
Ask where the dumpster, material delivery, crew vehicles, ladders, and debris-control equipment will go. Identify septic components, irrigation, low wires, delicate pavement, narrow drives, gates, and plantings that need protection. Keep emergency access and neighboring driveways clear.
| Area | Homeowner preparation | Confirm with contractor |
|---|---|---|
| Driveway and yard | Move vehicles, furniture, grills, toys, hoses, and portable planters | Delivery, dumpster, ladder, and equipment locations |
| Attic and upper rooms | Cover stored items; remove fragile wall or shelf items affected by vibration | Access needed for decking, ventilation, or leak inspection |
| Household | Plan for noise, pets, children, remote work, and temporary access limits | Start time, daily shutdown, door use, and contact person |
| Exterior systems | Mark irrigation, lighting, AC equipment, cameras, and fragile landscaping | Protection, detach/reset responsibilities, and exclusions |
Protect people from the active work zone
Roofing involves work at height, falling-object risk, sharp debris, equipment, and delivery traffic. OSHA’s residential fall-protection resources are written for employers and workers, but they reinforce why homeowners should not enter controlled work areas or climb onto the roof to monitor progress. Agree on a safe place for questions and inspections.
Prepare the attic and interior
Roof removal can dislodge dust and small debris into an unfinished attic. Cover stored belongings and move irreplaceable items. Take fragile objects off high shelves and walls where vibration is a concern. Keep attic access clear if the contractor needs to review decking, ventilation, wiring, or moisture evidence. Tell the contractor about bathroom fans, dryers, kitchen exhausts, or other ducts that terminate near or through the roof.
Resolve project decisions before delivery
- Roofing system, color, accessories, and approved substitutions
- Decking replacement process and unit pricing for concealed damage
- Flashing, penetrations, skylights, chimney interfaces, and ventilation scope
- Permit and inspection responsibilities
- Weather delay, change-order, and daily cleanup procedures
- Warranty documents and closeout photographs
Massachusetts’ HIC contractor resource notes that new or replacement roofing generally involves HIC registration, a roofing construction supervisor license, and a building permit; exact needs and ordinary-repair determinations belong with the local building official and qualified contractor.
Use a closeout walk
Ask the contractor to review completed roof components from safe, documented vantage points; confirm gutters, siding, windows, AC equipment, and landscaping are checked; review magnetic pickup and debris cleanup; collect permit/inspection status, warranties, product information, and maintenance instructions. Report a concern promptly rather than entering the roof area yourself.
Readiness questions
Should cars be moved?
Usually yes when the driveway supports delivery, dumpster, or crew access. Confirm how far away and for how long before material arrives.
Can I stay home?
Often, but expect sustained impact noise and changing access. Remote workers, young children, pets, and noise-sensitive occupants may be more comfortable elsewhere during active removal.
What if rain is forecast?
Ask how the contractor phases tear-off, monitors weather, dries in exposed areas, and communicates delays. The site-specific weather decision belongs to the contractor.
Golini Roofing’s roof replacement service, roof repairs, and gutter services support North Shore homeowners from Wakefield.